Well, as you can see, it's down to the frame.
All cleaned, new lick of paint.
Swingarm bearings were ok, cleaned and freshly greased.
The coil brackets were cut off and welded on the inside of the top frame rails.
NOTE: You can only do this if you use individual air filters.
The frame coolant inlet and outlet were plugged as I never really liked the idea of the coolant running inside the frame. I'm going to use a long braided coolant line from the radiator to the water pump. I'm going to use the FZR1000 water pump cover because the inlet faces forward where I need it.
quinta-feira, 17 de dezembro de 2009
Subscrever:
Enviar feedback (Atom)
Sem comentários:
Enviar um comentário